A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.

B, process each link in the process of IPQC (Input process quality control process inspection) patrol inspection.

C, after finished by QC full inspection before packing into the next process packaging.

D, OQC before shipment for each electric toothbrush to do full inspection.